|
Urban Selected for DelDOT Three-Year Open End Contract |
|
|
Project assignments over the three-year term of the contract may include: assessment and evaluation of multi-modal transportation requirements, preparation of general location studies and advanced planning projects, design of transportation improvements projects throughout the state, and provision of additional support services such as traffic signal coordination and public involvement activities on an as-needed basis. Types of projects may range from small-scale transportation analysis to major corridor/sub-area transportation planning and engineering. Assignments may also involve performing field investigations, designs, and plan preparation for miscellaneous design projects and small, short term location studies.